This project consisted of two phases being completed during two off-seasons periods.
The first phase was the stabilization of the existing masonry walls which includes structural framing and sheathing. This phase was required to be complete before the next phase could proceed.
The second was the removal and replacement of one ice rink slab which includes new heating and cooling lines, new ice slab and dasher boards, new player areas and a new wheelchair ramp and viewing platform.