BCCSA ICBA

Projects

BURNABY 8 RINKS RINK 7 UPGRADE
Client
Canlan Investments
Consultant
Krahn Engineering Ltd.
Location
Burnaby, B.C.
Construction Value
$1.6 million
Delivery Method
General Contractor
Completion Date
August, 2014
Project Description

The removal of the frozen ground / peat mixture beneath the existing ice rink to facilitate the installation of new foundations and ice rink / soccer field.

The foundation work included accelerated thawing of the frozen ground / peat mixture, installation of steel mini piles, cast-in-placee beams and precast hollow-core slabs withing the building to support the existing building structure and the new rink / soccer assemblies.

The Project also included removal and replacement of the refrigerant system and rink assemblies inclusive of sand, insulation, concrete curbs and arena boards.