Client
OK Tire Stores
Consultant
Craven Huston Powers Architects
Location
Abbotsford, BC
Construction Value
TBD
Delivery Method
Construction Management
Completion Date
2018
Project Description

The Project is to re-build within the original building footprint, with two zero lot lines, after fire destroyed the original building.

The work includes hazardous material assessment, deconstruction of the existing building, and foundation upgrades for the new structural steel framed building.

The proposed building envelope will include insulated wall panels and metal composite panels on framing to enclose a new service and customer area.